Electrical engineers could wish to mimic a full power load for a number of reasons. In general, theyre used to test and calibrate the performance and efficiency of an available power source. A more specific application is to ensure the proper functioning of an auxiliary power source before an outage knocks out the primary source.
Uses for load banks in a manufacturing setting include:
- Engine cell testing: Manufacturers use load banks to test the performance of their new engines. Using variable mechanical loads and dynamometers, engineers can fine-tune how the engine functions to ensure it delivers power efficiently no matter the circumstances.
- Generator cell testing: Standby generator manufacturers use load banks in a similar fashion to appraise the stability and resilience of generator power units. In this scenario, the load bank assists with calibrating the generator to bring its performance in line with tolerances.
Whether its the original equipment manufacturer performing the testing or one of its customers, load banks are the right tool for appraising, measuring and adjusting the performance and output of a power source.
What Are The Benefits Of Industrial Generator Load Banking
Load banks are an important asset for any industry to have because they ensure the proper running of equipment in the event of power outages. Specifically, a Load Bank Hire can create a load similar to daily use and test a power source for running efficiency. By imitating the original load, there is no chance of random or unpredictable current. Load banks are a contained system unit that integrates both controls and accessories into one installed location. The power source will supply the power, but the load bank uses this energy to protect and support the power source as well as test it.
Why Is Load Bank Installation Needed
Equipment for load bank testing is crucial to ensuring long-life and maximum reliability from the generator system.
Building loads are typically sized to not heavily load the generator system and to allow room for the addition of electrical loads in the future. Additionally, transferring critical loads to the generator for testing is often not practical, as these lightly loaded conditions end up creating wet stacking conditions in diesel engines, which can be harmful to its internals. This can also be a detriment as to how light loads do not effectively test the cooling system operation, which may be masking an underlying problem with the cooling package.
Load bank equipment resolves each of these concerns by periodically testing the diesel engine under heavy loads, ensuring proper operation of the cooling package, as well as increasing exhaust temperatures above the manufacturers minimum exhaust gas temperature recommendation, which reduces the effect of wet stacking in the engine.
Also Check: Ibc Savings Account Interest Rate
So What Is A Load Bank Test
In a nutshell, a load bank test is a test or series of tests on your backup power supply. If you think simply powering up the generator and seeing if it works is enough, you are wrong, as this method will not tell you if your generator is capable of taking on a full load. The last thing you want as a business is to encounter a power outage and have a standby power supply that isnt capable of taking the load. Effective and efficient load bank testing for generators ensures that your emergency power supply wont falter under pressure.
Learn The Load Bank Indicators Switches And Variable Load Toggles
Before turning on the generator, ensure you understand the various indicators on your load banks user interface. One of the most important indicators you should keep an eye on is the overheating light. Also, find the toggle switches that allow you to move from a 25% load all the way to a 100% load.
Recommended Reading: Td Overdraft
What Are The Different Types Of Load Banks
There are three common types of electrical load banks:
Resistive load banks are the most common type of electrical load bank. These particular generator load banks offer equivalent loading to generators and prime movers, with the same kilowatt or horsepower amount of load applied to a generator by the load bank also being applied to the prime mover by the generator. In load bank testing, resistive load banks are used to mimic resistive load types such as heating loads and are the usual choice for testing the wherewithal of domestic power sources such as automotive batteries.
Inductive load banks are usually used in conjunction with resistive electrical load banks to conduct load testing of an entire power system. The iron-core reactive element of an inductive electrical load bank works in concert with resistive load banks to create a lagging power factor load. When these two types of banks work together in load bank testing, a wide variety of generators, load tap changers, conductors, and other equipment can be accurately assessed with currents that are out of phase with the voltage.
There are also a host of combined load banks that can serve multiple functions in load bank testing across a wide variety of industries and domestic power source concerns. In short, theres an electrical load bank out there for almost any power testing scenario you can think of!
When Do You Need To Conduct Genset Load Banking
Even if you regularly operate your generator, the routine start-up cannot verify the unit’s capabilities, especially if you run at a significantly lower kW rating than the specifications. According to NFPA, the typical rule is that you should execute load banking on any genset that operated at 30% or lower than its kW rating . Other instances include:
- When required by law or regulatory bodies, for example, NFPA 110 requires standby generators that are meant to protect the occupants of a commercial building or where genset failure could lead to injuries/deaths to be tested monthly.
- For businesses where backup generators are to reduce losses, load bank testing can be conducted annually.
- When the generator is new or during commissioning to establish the reference point for future working performance.
Don’t Miss: Chase Quickpay Fee
Our Loadbank Testing Will Make Sure Your Power Wont Let You Down When You Need It Most
Loadbanks are used to test electrical power supplies. They simulate variable electrical load conditions in a way that can be accurately controlled, measured and recorded.
Its vital to test your systems so you know theyre up to the job whether youre commissioning new generators, or need to carry out routine maintenance. Its also important to run backup generators regularly to burn off any unburned fuel, oil, or condensation.
Its important to plan load tests carefully. Thats where we can help. Just tell us what you need to test, well size, deliver and program our loadbanks, and you can do your test right away.
And if youd feel happier with us doing the test for you, we offer that service too. Our experienced engineers can support you at every step from planning and installing to testing and reports.
The Importance Of A Load Bank Test
A load bank test is used to test the UPS and generator which is under load conditions to ensure that they are working optimally. This method is a way of validating the true operational performance as well as the battery autonomy used in UPS system. The main reason for testing load banks is to carry out preventative maintenance necessary to avoid future damages or breakdowns. In addition to preventative maintenance, load bank tests are used to ascertain the current conditions of UPS batteries as well as battery sets to show whether any of the cells are holding the charge, approaching the end of their working life or whether they are about to fail.
This facilitates their replacement before they cause a critical application problem. It is important to note that load bank test services are sometimes offered by suppliers of power protection equipment e.g. Uninterruptible Power Supplies Limited as a part of UPS commissioning process.
Read Also: Ibc Bank Telefono
Why Is Generator Load Bank Testing Done
Your generator set is a valuable resource that provides a dependable emergency power to your business when power from the utility grid is suddenly lost, or power is not available in your environment. In the event of a power failure you want to have peace of mind that your backup power supply will spring into action seamlessly on a moments notice. But what happens when the power goes out and your generator fails function as expected? The result can often be costly and sometimes catastrophic depending upon your application.
This is precisely the reason generator load bank testing is an essential piece of a comprehensive preventative generator maintenance plan, which you should ideally have conducted on your genset each year. Load bank testing helps to ensure that your generator will be fully dependable and operational, as well as completely capable of the highest possible load it may be required to handle at any critical point in time. Load testing your emergency standby generator system should be part of a standard planned maintenance program for all systems.
Why Is Load Bank Testing Important
Constant, uninterrupted power is essential for many facilities, from hospitals and food storage facilities to data centers. Any failures of the primary or backup power systems could jeopardize patient health or lead to significant financial losses. Generator load banks allow maintenance personnel to test generators, UPS systems, and other equipment at varying degrees of load, monitoring for signs of problems like:
- Drops in voltage
You May Like: Td Bank Student Account Overdraft
These Are Some Of The Steps To Test A Load Bank Testing
- Step 1
Check all fluids level in the Generator. Make sure that the fuel tank is full, The Oil level is correct, and the radiator or coolant tank is full, If it is a water-cooled generator.
- Step 2
Start the Generator and allow it to reach the normal temperature. And now watch listen for any potential problem or abnormal noise. If any problem occurs do not proceed with the test until you take care of them.
- Step 3
Now connecting the load, with any large 220-volt loads and adding smaller 110-volt load until each leg carries 50% of the maximum continuous rated load of the Generator. Do not exceed more than 50% on any one leg. If possible use 220-volt resistive loads such as large space heater or water heater. they simplify this step because they applied the load to each leg equally.
- Step 4
Check the amperage of each leg with the ammeter, and check the voltage from each leg for neutral with the VOM set to read each volt. For 110/220 volt single phase generators, the voltage of each leg should fall between 105 and 125 volts and the current for each leg divided by the voltage should be half of the rated output current.
For example, if the voltage of each leg neutral is 117 volts loaded, and the Generator is rated at 10 KW continuous each should be loaded to the 5000 divided by 117 or approximately 42 amperes. If one or both leg drop below 105 volts at full load the generator has failed the test and need repair.
- Step 5
- Step 6
What Is A Load Bank And Why Do Manufacturers Need Them
A load bank can be an important asset in a variety of industries. Load banks are stationary or portable tools that mimic the expected electrical load on a power source in a commercial or industrial setting.
As well see, this setup is useful in many fields including in the manufacturing industry. Manufacturers need a way to make sure their power sources deliver the consistency customers require. Meanwhile, customers in the field need tools to perform ongoing testing of their primary and secondary power sources for peace of mind.
Recommended Reading: Jackson Hewitt Stimulus Check 2021 Serve Card
Field Testing And Exercise
Once generators are installed, it is a good idea to get them tested regularly to make sure they maintain top level performance. Load banks are used to verify generators because they imitate the load of the facility and if there are any problems, they can be identified before the generator is actually needed in an emergency situation.
Test The Functionality Of Your Generator Through Load Banks
What is Generator Load Bank Testing?
Generator load bank testing is an important aspect of preventative maintenance one that requires a full assessment and examination of the components of your generator under loaded conditions. When there’s no recurring power outage in your area, your standby and emergency power systems only run to little or no loads for an extended period of time. However, this is not sufficient as there’s no guarantee that your generator will measure up to its full performance capacity when power failure kicks in. Generators become desensitized overtime and at worst-case scenario if not maintained can cause fire and safety hazards, high operating costs, and increased emissions.
Look at generator load bank testing as a surety for contingency options during emergency power situations. Despite constant exposure to light loads, your generator will need periodic testing to ensure that it meets some of the most stringent electrical codes. To eradicate unnecessary downtime and insure continuity of electricity flow, your generator should be subjected to load bank testing.
Wet Stacking
How Generator Load Bank Testing Works
Routine exercise for your electrical equipment is mandatory for its proper maintenance and efficient operational status. To test if your generator is in proper working condition, run it under artificial loads at its maximum operating capacity for a sustained amount of time.
You May Like: Td Overdraft Policy
What Are Some Main Applications For Electrical Load Banks
There are way too many uses for a proper generator load bank to list here in full, but heres a snapshot of the different applications for load banks across a gamut of different industries:
- Conducting load rejection tests.
- Ensuring stand-by generators are fully operational in the event of an emergency.
- Engine cell testing to ensure new engines can handle the variety of loads common during normal usage.
- Generator testing for generator manufacturers who want to double-check the stability and overall strength of a newly-manufactured generator.
- Eliminating the problem of wet-stacking in diesel generators by stopping the common buildup of grease and oils which occurs when a diesel generator isnt consuming fuel at optimum capacity.
- Load bank testing of batteries and UPS systems.
- Factory load bank testing of turbines to ensure they are functioning at peak capacity.
- Key excision of carbon buildup on generator piston rings to keep generators healthy and capable of running at top efficiency.
Resistive Reactive Load Bank
A combined load bank usually consists of both resistive elements and inductors that can be used to provide load testing at non-unity PF including the capability to test the generator set fully at 100% nameplate kVA rating. Combined load banks incorporate resistors and inductors all in a single construction which can be independently switched to allow resistive only, inductive only, or varying lagging power factor testing. Combined load banks are rated in kilovolt-amperes . Its worth noting that combined load banks can consist of resistive, inductive, and capacitive also.
Typically, facilities require motor-driven devices, transformers and capacitors. If this is the case, then the load banks used for testing require reactive power compensation. The ideal solution is a combination of both resistive and reactive elements in one load bank package.
Resistive/reactive loads are able to mimic motor loads and electromagnetic devices within a power system, as well as provide purely resistive loads.
Many backup generators and turbines need to be commissioned at nameplate capacity using a combination of resistive and reactive load to fully qualify their operating capability. Using a resistive/reactive load bank enables comprehensive testing from a single unit. A range of resistive/reactive load banks are available to simulate these types of loads on a power source and the transformers, relays and switches which will distribute the power throughout the facility.
Recommended Reading: Bofa.com Activate
How Is Load Banking Testing Done And Its Results Reported
To carry out the testing process, the load banks should be supplied with quality rated cables to facilitate effective charge transfer. The load bank should not be placed more than 20 meters from output power distribution unit or UPS terminals. You should understand that load banks are made up of heating elements and fans which are responsible for cooling the system.
Therefore, allowances should make to allow heat dissipation and attenuation of noise during the testing process. Also, you should not test the UPS system close to an area where people are working, near sensitive alarms or sprinkler systems as a precautionary measure.
After carrying out the test, measurements are taken during discharge where the battery and system performances are determined. A load bank test identifies the problems with the generator and the UPS prompting for immediate actions to be taken to facilitate its efficiency.
In case there is a standby generator, load bank testing will indicate:
- The ability of the engine to provide the power required
- The capability of the alternator to provide the required voltage stability for the system
- The efficiency of control systems under different conditions of the load
- The stable frequency
- The pressure of oil and fuel
- Performance of the whole load bank system
To Conclude On Load Bank Tests
Need a quick estimate?
Reasons Behind Generator Load Bank Testing
Power outages are sudden and unexpected in our part of the world. We need our electrical backup source to be on point and properly functioning in such scenarios. Load bank testing is the best way to ensure and avoid any such problems. It is ideal for conducting this test annually. Following are the reasons behind conducting this test.
Generator load bank testing is carried out to ensure that your generator will produce and maintain full load under its capacity without overheating and shutting down.
Commonly, generator exercise is done on very little or no load. While this is a good idea, but it does not ensure that your generator will successfully manage the full load. For this purpose, generator load bank testing is very important.
Generators that are on automatic mode also need to be load tested. The generators capacity weakens over the years hence, it is important to get the load tested.
Diesel generators are prone to wet-stacking. Wet stacking refers to the build-up of unburned fuel and soot build-up in the exhaust systems. Wet-stacking can seriously damage the generators capacity to work at optimum level and give full output. Load bank testing works to nullify the negative impacts of wet-stacking by eliminating the deposits and testing whether the generator is working properly or not.